Turnmill Exchange
JOURNAL / ARCHIVE

Workshop ledger

Maintenance notes from Wren Docks and the founding record of the Exchange.

Workshop note 1. At the glaze cabinet, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 1.

Workshop note 2. At the inspection bench, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 2.

Workshop note 3. At the warp frame, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 3.

Workshop note 4. At the lubrication station, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 4.

Workshop note 5. At the transfer press, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 5.

Workshop note 6. At the mixing cradle, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 6.

Workshop note 7. At the sensor rail, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 7.

Workshop note 8. At the packing line, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 8.

Workshop note 9. At the glaze cabinet, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 9.

Workshop note 10. At the inspection bench, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 10.

Workshop note 11. At the warp frame, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 11.

Workshop note 12. At the lubrication station, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 12.

Workshop note 13. At the transfer press, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 13.

Workshop note 14. At the mixing cradle, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 14.

Workshop note 15. At the sensor rail, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 15.

Workshop note 16. At the packing line, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 16.

Workshop note 17. At the glaze cabinet, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 17.

Workshop note 18. At the inspection bench, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 1.

Workshop note 19. At the warp frame, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 2.

Workshop note 20. At the lubrication station, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 3.

Workshop note 21. At the transfer press, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 4.

Workshop note 22. At the mixing cradle, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 5.

Workshop note 23. At the sensor rail, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 6.

Workshop note 24. At the packing line, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 7.

Workshop note 25. At the glaze cabinet, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 8.

Workshop note 26. At the inspection bench, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 9.

Workshop note 27. At the warp frame, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 10.

Workshop note 28. At the lubrication station, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 11.

Workshop note 29. At the transfer press, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 12.

Workshop note 30. At the mixing cradle, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 13.

Workshop note 31. At the sensor rail, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 14.

Workshop note 32. At the packing line, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 15.

Workshop note 33. At the glaze cabinet, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 16.

Workshop note 34. At the inspection bench, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 17.

Workshop note 35. At the warp frame, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 1.

Workshop note 36. At the lubrication station, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 2.

Workshop note 37. At the transfer press, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 3.

Workshop note 38. At the mixing cradle, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 4.

Workshop note 39. At the sensor rail, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 5.

Workshop note 40. At the packing line, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 6.

Workshop note 41. At the glaze cabinet, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 7.

Workshop note 42. At the inspection bench, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 8.

Workshop note 43. At the warp frame, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 9.

Workshop note 44. At the lubrication station, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 10.

Workshop note 45. At the transfer press, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 11.

Workshop note 46. At the mixing cradle, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 12.

Workshop note 47. At the sensor rail, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 13.

Workshop note 48. At the packing line, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 14.

Workshop note 49. At the glaze cabinet, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 15.

Workshop note 50. At the inspection bench, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 16.

Workshop note 51. At the warp frame, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 17.

Workshop note 52. At the lubrication station, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 1.

Workshop note 53. At the transfer press, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 2.

Workshop note 54. At the mixing cradle, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 3.

Workshop note 55. At the sensor rail, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 4.

Workshop note 56. At the packing line, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 5.

Workshop note 57. At the glaze cabinet, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 6.

Workshop note 58. At the inspection bench, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 7.

Workshop note 59. At the warp frame, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 8.

Workshop note 60. At the lubrication station, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 9.

Workshop note 61. At the transfer press, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 10.

Workshop note 62. At the mixing cradle, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 11.

Workshop note 63. At the sensor rail, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 12.

Workshop note 64. At the packing line, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 13.

Workshop note 65. At the glaze cabinet, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 14.

Workshop note 66. At the inspection bench, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 15.

Workshop note 67. At the warp frame, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 16.

Workshop note 68. At the lubrication station, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 17.

Workshop note 69. At the transfer press, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 1.

Workshop note 70. At the mixing cradle, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 2.

Workshop note 71. At the sensor rail, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 3.

Workshop note 72. At the packing line, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 4.

Workshop note 73. At the glaze cabinet, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 5.

Workshop note 74. At the inspection bench, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 6.

Workshop note 75. At the warp frame, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 7.

Workshop note 76. At the lubrication station, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 8.

Workshop note 77. At the transfer press, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 9.

Workshop note 78. At the mixing cradle, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 10.

Workshop note 79. At the sensor rail, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 11.

Workshop note 80. At the packing line, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 12.

Workshop note 81. At the glaze cabinet, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 13.

Workshop note 82. At the inspection bench, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 14.

Workshop note 83. At the warp frame, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 15.

Workshop note 84. At the lubrication station, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 16.

Workshop note 85. At the transfer press, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 17.

Workshop note 86. At the mixing cradle, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 1.

Workshop note 87. At the sensor rail, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 2.

Workshop note 88. At the packing line, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 3.

Workshop note 89. At the glaze cabinet, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 4.

Workshop note 90. At the inspection bench, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 5.

Workshop note 91. At the warp frame, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 6.

Workshop note 92. At the lubrication station, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 7.

Workshop note 93. At the transfer press, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 8.

Workshop note 94. At the mixing cradle, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 9.

Workshop note 95. At the sensor rail, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 10.

Workshop note 96. At the packing line, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 11.

Workshop note 97. At the glaze cabinet, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 12.

Workshop note 98. At the inspection bench, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 13.

Workshop note 99. At the warp frame, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 14.

Workshop note 100. At the lubrication station, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 15.

Workshop note 101. At the transfer press, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 16.

Workshop note 102. At the mixing cradle, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 17.

Workshop note 103. At the sensor rail, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 1.

Workshop note 104. At the packing line, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 2.

Workshop note 105. At the glaze cabinet, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 3.

Workshop note 106. At the inspection bench, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 4.

Workshop note 107. At the warp frame, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 5.

Workshop note 108. At the lubrication station, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 6.

Workshop note 109. At the transfer press, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 7.

Workshop note 110. At the mixing cradle, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 8.

Workshop note 111. At the sensor rail, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 9.

Workshop note 112. At the packing line, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 10.

Workshop note 113. At the glaze cabinet, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 11.

Workshop note 114. At the inspection bench, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 12.

Workshop note 115. At the warp frame, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 13.

Workshop note 116. At the lubrication station, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 14.

Workshop note 117. At the transfer press, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 15.

Workshop note 118. At the mixing cradle, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 16.

Workshop note 119. At the sensor rail, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 17.

Workshop note 120. At the packing line, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 1.

Workshop note 121. At the glaze cabinet, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 2.

Workshop note 122. At the inspection bench, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 3.

Workshop note 123. At the warp frame, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 4.

Workshop note 124. At the lubrication station, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 5.

Workshop note 125. At the transfer press, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 6.

Workshop note 126. At the mixing cradle, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 7.

Workshop note 127. At the sensor rail, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 8.

Workshop note 128. At the packing line, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 9.

Workshop note 129. At the glaze cabinet, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 10.

Workshop note 130. At the inspection bench, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 11.

Workshop note 131. At the warp frame, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 12.

Workshop note 132. At the lubrication station, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 13.

Workshop note 133. At the transfer press, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 14.

Workshop note 134. At the mixing cradle, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 15.

Workshop note 135. At the sensor rail, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 16.

Workshop note 136. At the packing line, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 17.

Workshop note 137. At the glaze cabinet, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 1.

Workshop note 138. At the inspection bench, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 2.

Workshop note 139. At the warp frame, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 3.

Workshop note 140. At the lubrication station, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 4.

Workshop note 141. At the transfer press, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 5.

Workshop note 142. At the mixing cradle, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 6.

Workshop note 143. At the sensor rail, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 7.

Workshop note 144. At the packing line, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 8.

Workshop note 145. At the glaze cabinet, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 9.

Workshop note 146. At the inspection bench, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 10.

Workshop note 147. At the warp frame, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 11.

Workshop note 148. At the lubrication station, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 12.

Workshop note 149. At the transfer press, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 13.

Workshop note 150. At the mixing cradle, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 14.

Workshop note 151. At the sensor rail, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 15.

Workshop note 152. At the packing line, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 16.

Workshop note 153. At the glaze cabinet, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 17.

Workshop note 154. At the inspection bench, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 1.

Workshop note 155. At the warp frame, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 2.

Workshop note 156. At the lubrication station, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 3.

Workshop note 157. At the transfer press, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 4.

Workshop note 158. At the mixing cradle, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 5.

Workshop note 159. At the sensor rail, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 6.

Workshop note 160. At the packing line, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 7.

Workshop note 161. At the glaze cabinet, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 8.

Workshop note 162. At the inspection bench, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 9.

Workshop note 163. At the warp frame, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 10.

Workshop note 164. At the lubrication station, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 11.

Workshop note 165. At the transfer press, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 12.

Workshop note 166. At the mixing cradle, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 13.

Workshop note 167. At the sensor rail, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 14.

Workshop note 168. At the packing line, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 15.

Workshop note 169. At the glaze cabinet, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 16.

Workshop note 170. At the inspection bench, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 17.

Workshop note 171. At the warp frame, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 1.

Workshop note 172. At the lubrication station, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 2.

Workshop note 173. At the transfer press, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 3.

Workshop note 174. At the mixing cradle, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 4.

Workshop note 175. At the sensor rail, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 5.

Workshop note 176. At the packing line, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 6.

Workshop note 177. At the glaze cabinet, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 7.

Workshop note 178. At the inspection bench, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 8.

Workshop note 179. At the warp frame, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 9.

Workshop note 180. At the lubrication station, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 10.

Workshop note 181. At the transfer press, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 11.

Workshop note 182. At the mixing cradle, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 12.

Workshop note 183. At the sensor rail, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 13.

Workshop note 184. At the packing line, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 14.

Workshop note 185. At the glaze cabinet, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 15.

Workshop note 186. At the inspection bench, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 16.

Workshop note 187. At the warp frame, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 17.

Workshop note 188. At the lubrication station, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 1.

Workshop note 189. At the transfer press, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 2.

Workshop note 190. At the mixing cradle, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 3.

Workshop note 191. At the sensor rail, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 4.

Workshop note 192. At the packing line, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 5.

Workshop note 193. At the glaze cabinet, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 6.

Workshop note 194. At the inspection bench, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 7.

Workshop note 195. At the warp frame, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 8.

Workshop note 196. At the lubrication station, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 9.

Workshop note 197. At the transfer press, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 10.

Workshop note 198. At the mixing cradle, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 11.

Workshop note 199. At the sensor rail, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 12.

Workshop note 200. At the packing line, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 13.

Workshop note 201. At the glaze cabinet, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 14.

Workshop note 202. At the inspection bench, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 15.

Workshop note 203. At the warp frame, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 16.

Workshop note 204. At the lubrication station, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 17.

Workshop note 205. At the transfer press, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 1.

Workshop note 206. At the mixing cradle, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 2.

Workshop note 207. At the sensor rail, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 3.

Workshop note 208. At the packing line, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 4.

Workshop note 209. At the glaze cabinet, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 5.

Workshop note 210. At the inspection bench, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 6.

Workshop note 211. At the warp frame, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 7.

Workshop note 212. At the lubrication station, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 8.

Workshop note 213. At the transfer press, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 9.

Workshop note 214. At the mixing cradle, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 10.

Workshop note 215. At the sensor rail, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 11.

Workshop note 216. At the packing line, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 12.

Workshop note 217. At the glaze cabinet, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 13.

Workshop note 218. At the inspection bench, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 14.

Workshop note 219. At the warp frame, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 15.

Workshop note 220. At the lubrication station, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 16.

Workshop note 221. At the transfer press, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 17.

Workshop note 222. At the mixing cradle, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 1.

Workshop note 223. At the sensor rail, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 2.

Workshop note 224. At the packing line, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 3.

Workshop note 225. At the glaze cabinet, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 4.

Workshop note 226. At the inspection bench, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 5.

Workshop note 227. At the warp frame, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 6.

Workshop note 228. At the lubrication station, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 7.

Workshop note 229. At the transfer press, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 8.

Workshop note 230. At the mixing cradle, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 9.

Workshop note 231. At the sensor rail, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 10.

Workshop note 232. At the packing line, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 11.

Workshop note 233. At the glaze cabinet, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 12.

Workshop note 234. At the inspection bench, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 13.

Workshop note 235. At the warp frame, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 14.

Workshop note 236. At the lubrication station, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 15.

Workshop note 237. At the transfer press, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 16.

Workshop note 238. At the mixing cradle, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 17.

Workshop note 239. At the sensor rail, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 1.

Workshop note 240. At the packing line, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 2.

Workshop note 241. At the glaze cabinet, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 3.

Workshop note 242. At the inspection bench, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 4.

Workshop note 243. At the warp frame, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 5.

Workshop note 244. At the lubrication station, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 6.

Workshop note 245. At the transfer press, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 7.

Workshop note 246. At the mixing cradle, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 8.

Workshop note 247. At the sensor rail, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 9.

Workshop note 248. At the packing line, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 10.

Workshop note 249. At the glaze cabinet, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 11.

Workshop note 250. At the inspection bench, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 12.

Workshop note 251. At the warp frame, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 13.

Workshop note 252. At the lubrication station, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 14.

Workshop note 253. At the transfer press, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 15.

Workshop note 254. At the mixing cradle, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 16.

Workshop note 255. At the sensor rail, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 17.

Workshop note 256. At the packing line, the dock crew relabelled the control dial before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 1.

Workshop note 257. At the glaze cabinet, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 2.

Workshop note 258. At the inspection bench, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 3.

Workshop note 259. At the warp frame, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 4.

Workshop note 260. At the lubrication station, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 5.

Workshop note 261. At the transfer press, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 6.

Workshop note 262. At the mixing cradle, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 7.

Workshop note 263. At the sensor rail, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 8.

Workshop note 264. At the packing line, the dock crew replaced the brass guide before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 9.

Workshop note 265. At the glaze cabinet, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 10.

Workshop note 266. At the inspection bench, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 11.

Workshop note 267. At the warp frame, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 12.

Workshop note 268. At the lubrication station, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 13.

Workshop note 269. At the transfer press, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 14.

Workshop note 270. At the mixing cradle, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 15.

Workshop note 271. At the sensor rail, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 16.

Workshop note 272. At the packing line, the dock crew recorded a second calibration before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 17.

Workshop note 273. At the glaze cabinet, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 1.

Workshop note 274. At the inspection bench, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 2.

Workshop note 275. At the warp frame, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 3.

Workshop note 276. At the lubrication station, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 4.

Workshop note 277. At the transfer press, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 5.

Workshop note 278. At the mixing cradle, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 6.

Workshop note 279. At the sensor rail, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 7.

Workshop note 280. At the packing line, the dock crew checked the oil filter before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 8.

Workshop note 281. At the glaze cabinet, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 9.

Workshop note 282. At the inspection bench, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 10.

Workshop note 283. At the warp frame, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 11.

Workshop note 284. At the lubrication station, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 12.

Workshop note 285. At the transfer press, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 13.

Workshop note 286. At the mixing cradle, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 14.

Workshop note 287. At the sensor rail, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 15.

Workshop note 288. At the packing line, the dock crew moved the alignment marks before the afternoon handover. The revised entry was signed at bench 12 and filed with the maintenance drawings for bay 16.

Workshop note 289. At the glaze cabinet, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 13 and filed with the maintenance drawings for bay 17.

Workshop note 290. At the inspection bench, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 14 and filed with the maintenance drawings for bay 1.

Workshop note 291. At the warp frame, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 15 and filed with the maintenance drawings for bay 2.

Workshop note 292. At the lubrication station, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 16 and filed with the maintenance drawings for bay 3.

Workshop note 293. At the transfer press, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 17 and filed with the maintenance drawings for bay 4.

Workshop note 294. At the mixing cradle, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 18 and filed with the maintenance drawings for bay 5.

Workshop note 295. At the sensor rail, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 19 and filed with the maintenance drawings for bay 6.

Workshop note 296. At the packing line, the dock crew added a numbered gauge before the afternoon handover. The revised entry was signed at bench 20 and filed with the maintenance drawings for bay 7.

Workshop note 297. At the glaze cabinet, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 21 and filed with the maintenance drawings for bay 8.

Workshop note 298. At the inspection bench, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 22 and filed with the maintenance drawings for bay 9.

Workshop note 299. At the warp frame, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 23 and filed with the maintenance drawings for bay 10.

Workshop note 300. At the lubrication station, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 1 and filed with the maintenance drawings for bay 11.

Workshop note 301. At the transfer press, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 2 and filed with the maintenance drawings for bay 12.

Workshop note 302. At the mixing cradle, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 3 and filed with the maintenance drawings for bay 13.

Workshop note 303. At the sensor rail, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 4 and filed with the maintenance drawings for bay 14.

Workshop note 304. At the packing line, the dock crew cleaned the optical port before the afternoon handover. The revised entry was signed at bench 5 and filed with the maintenance drawings for bay 15.

Workshop note 305. At the glaze cabinet, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 6 and filed with the maintenance drawings for bay 16.

Workshop note 306. At the inspection bench, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 7 and filed with the maintenance drawings for bay 17.

Workshop note 307. At the warp frame, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 8 and filed with the maintenance drawings for bay 1.

Workshop note 308. At the lubrication station, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 9 and filed with the maintenance drawings for bay 2.

Workshop note 309. At the transfer press, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 10 and filed with the maintenance drawings for bay 3.

Workshop note 310. At the mixing cradle, the dock crew measured the cycle time before the afternoon handover. The revised entry was signed at bench 11 and filed with the maintenance drawings for bay 4.

Colophon

Turnmill Exchange was founded by Iona Pell in 1998. August Vale joined as the first programme director the following year.